{"id":2175,"date":"2022-09-07T14:02:50","date_gmt":"2022-09-07T18:02:50","guid":{"rendered":"https:\/\/highway413.ca\/en\/?page_id=2175"},"modified":"2025-08-25T14:11:42","modified_gmt":"2025-08-25T18:11:42","slug":"pte","status":"publish","type":"page","link":"https:\/\/highway413.ca\/en\/pte\/","title":{"rendered":"Permission To Enter (PTE)"},"content":{"rendered":"\n\n\t<a href=\"https:\/\/highway413.ca\/fr\/autorisation-dentree\" target=\"_self\" role=\"button\" aria-label=\"Fran\u00e7ais\">\n\t\t\t\t\t\tFran\u00e7ais\n\t\t\t\t\t<\/a>\n\t\t<h1>\n\t\t\tHighway 413 Preliminary Design and Assessment of Environmental Impacts: Permission To Enter (PTE)\n\t\t<\/h1>\n\t<h2>Permission To Enter (PTE)<\/h2>\n<p>Field investigations are being conducted to inventory existing environmental and engineering conditions within the Highway 413 Project Study Area. Permission to Enter (PTE) grants the Project Team temporary access to private property with the consent of the property owner(s) to conduct these investigations. This important step in the assessment of impacts allows the Project Team to confirm existing conditions, determine anticipated impacts, and develop appropriate mitigation measures along the\u00a0<a href=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2022\/06\/HWY413_PreferredRouteFactSheet_April-2022.pdf\">Highway 413 <\/a>Preferred Alignment.<\/p>\n<p>Property owners within the Preferred Alignment were sent a PTE notification package, including a PTE letter, agreement, questionnaire, and fact sheet. Property owners in receipt of a PTE notification package are encouraged to follow the instructions below.<\/p>\n\t\t<ul>\n\t\t\t\t\t<li>\n\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-365-2.png\" alt=\"Group 365 (2)\" width=\"222\" height=\"222\" \/>\n\t\t\t\t<h1>01<\/h1>\n\t\t<h3><strong>Step 1: Receiving your PTE Form<\/strong><\/h3><p>Property owners will be notified by letter and\/or email and will receive a PTE form.<\/p>\t\t\t\n\t\t\t<\/li>\n\t\t\t\t\t<li>\n\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-366-1.png\" alt=\"Group 366 (1)\" width=\"222\" height=\"222\" \/>\n\t\t\t\t<h1>02<\/h1>\n\t\t<h3><strong>Step 2: Review and Sign your PTE Form<\/strong><\/h3><p>Property owners are requested to review and sign the PTE form. Please complete the Owner(s) name, mailing address, and the required email and phone number sections.Where applicable, complete the associated questionnaire that is included in the PTE notification package.If you would like to receive an electronic copy of the PTE form and questionnaire for e-signature, please email <a href=\"mailto:PTE@highway413.ca\">PTE@highway413.ca<\/a>, with your first and last name, property address, PIN number and Key ID number (all found on the PTE form).<\/p>\t\t\t\n\t\t\t<\/li>\n\t\t\t\t\t<li>\n\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-367.png\" alt=\"Group 367\" width=\"222\" height=\"222\" \/>\n\t\t\t\t<h1>03<\/h1>\n\t\t<h3><strong>Step 3: Submit your PTE form and questionnaire to the Project Team<\/strong><\/h3><p>Return a signed copy to the Project Team by email to <a href=\"mailto:PTE@highway413.ca\">PTE@highway413.ca<\/a> within three (3) weeks of receipt.ATTN: Nadia Dabagh<br \/>25 York Street, Suite 700<br \/>Toronto, Ontario M5J 2V5<\/p>\t\t\t\n\t\t\t<\/li>\n\t\t\t\t\t<li>\n\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-368.png\" alt=\"Group 368\" width=\"222\" height=\"222\" \/>\n\t\t\t\t<h1>04<\/h1>\n\t\t<h3><strong>Step 4: Property Access<\/strong><\/h3><p>Property owners will be notified by a member of the Project Team three to five business days prior to field staff entering your property.Property owner cooperation through the signing and returning of the PTE form is greatly appreciated.<\/p>\t\t\t\n\t\t\t<\/li>\n\t\t\t\t<\/ul>\n\t\t\t<a href=\"#contact\" target=\"_self\">\n\t\t\t\t\t\t\tContact us if you have any questions\n\t\t\t\t\t<\/a>\n\t<h2><strong>Background, Progress to Date &amp; Timelines<\/strong><\/h2>\n<p>Fieldwork is vital in Preliminary Design. It is a data-collecting exercise that informs decisions on aspects like bridge designs, pavement types, interchange locations, and configurations. This data also allows the Project Team to identify existing environmental conditions and determine potential negative and positive impacts so that the negative impacts can be mitigated or avoided altogether.<\/p>\n<p>The Phase 1 field investigation program was completed in December 2020. The Phase 2 field investigation program began in September 2021 and was completed in December 2022. The Phase 3 field investigation program began in December 2022 and was completed in December 2024.<\/p>\n<p>Phase 4 field investigations will begin in April 2025 and may continue until December 2026.<\/p>\n\t\t\t\tPhase 1 PTE Fieldwork &#8211; Completed\n\t\t\t\t<p>Phase 1 PTE field investigations consisted of field staff documenting observations, taking photos and mapping existing conditions.<\/p>\n<p>The Phase 1 field investigations began on March 9, 2020 and continued intermittently until December 31, 2020. The Phase 1 fieldwork program included a combination of the following investigations undertaken by the Project Team field staff:<\/p>\n<ul>\n<li><strong><em>Natural Environment Investigations<\/em><\/strong> &#8211; natural resource observations, including fisheries, wildlife, wetlands, and vegetation inventories; groundwater and drainage conditions (including water well surveys).<\/li>\n<li><strong><em>Socio-Economic Environment Investigations<\/em><\/strong> &#8211; land use and agricultural review; contaminant and waste management observations.<\/li>\n<li><strong><em>Cultural Environment Investigations<\/em><\/strong> &#8211; cultural heritage landscapes and built heritage resource assessments.<\/li>\n<li><strong><em>Engineering Investigations<\/em><\/strong> &#8211; engineering surveys to understand existing conditions that may influence design.<\/li>\n<\/ul>\n\t\t\t\tPhase 2 PTE Fieldwork &#8211; Completed\n\t\t\t\t<p>The Phase 2 fieldwork program included a combination of the following investigations undertaken by the Project Team field staff:<\/p>\n<ul>\n<li><strong><em>Natural Environment Investigations<\/em><\/strong> &#8211; natural resource observations, including fisheries, wildlife, wetlands, and vegetation inventories; groundwater and drainage conditions (including water well surveys).<\/li>\n<li><strong><em>Socio-Economic Environment Investigations<\/em><\/strong> &#8211; land use and agricultural review; contaminant and waste management observations.<\/li>\n<li><strong><em>Cultural Environment Investigations<\/em><\/strong> &#8211; Stage 2 Archaeological Assessments.<\/li>\n<li><strong><em>Engineering Investigations<\/em><\/strong> &#8211; geotechnical and borehole investigations; utility locate surveys; topographic surveys.<\/li>\n<\/ul>\n<p>Phase 2 fieldwork began in September 2021 and was completed in December 2022.<\/p>\n\t\t\t\tPhase 3 PTE Fieldwork &#8211; Completed\n\t\t\t\t<p>The Phase 3 fieldwork program included a combination of the following investigations undertaken by the Project Team field staff:<\/p>\n<ul>\n<li><strong><em>Natural Environment Investigations<\/em><\/strong> &#8211; natural resource observations, which included fish community and fish habitat surveys, vegetation classification and delineation, plant species inventories, Significant Wildlife Habitat surveys, amphibian call surveys, breeding bird surveys, and certain species-specific surveys for threatened or endangered species.<\/li>\n<li><strong><em>Socio-Economic Environment Investigations<\/em><\/strong> &#8211; land use and agricultural review; contaminant and waste management observations.<\/li>\n<li><strong><em>Cultural Environment Investigations<\/em><\/strong> &#8211; Stage 2 Archaeological Assessments.<\/li>\n<li><strong><em>Engineering Investigations<\/em><\/strong> &#8211; geotechnical and borehole investigations; utility locate surveys; topographic surveys.<\/li>\n<\/ul>\n<p>Phase 3 fieldwork began in December 2022 and was completed in December 2024.<\/p>\n\t\t\t\tPhase 4 PTE Fieldwork &#8211; Underway\n\t\t\t\t<p>The Phase 4 PTE program is a continuation of the work undertaken in 2023 and 2024 under the Phase 3 PTE program. This fieldwork will focus on properties we were unable to investigate previously and properties where further investigations are required.<\/p>\n<p>Phase 4 field investigations will include fieldwork that may require some temporary property alteration. Temporary alteration to a property may refer to open-test pitting, installation of monitoring well(s), drilling of boreholes, and\/or limited interference with the use of a portion of a property. Once the investigation is complete, temporary changes to a property will be returned to its original condition at no cost to the property owner.<\/p>\n<p>The Phase 4 fieldwork program will include any combination of the following investigations being undertaken on your property by the Project Team field staff:<\/p>\n<ul>\n<li><strong><em>Natural Environment Investigations<\/em><\/strong> &#8211; natural resource observations, which may include fish community and fish habitat surveys, vegetation classification and delineation, plant species inventories, Significant Wildlife Habitat surveys, amphibian call surveys, breeding bird surveys, and certain species-specific surveys for threatened or endangered species. All of these surveys are nonintrusive and will involve trained ecologists walking the subject property, recording ecological data, mapping features, and photographing natural features.<\/li>\n<li><strong><em>Socio-Economic Environment Investigations<\/em><\/strong> &#8211; land use and agricultural review, contaminant and waste management observations.<\/li>\n<li><strong><em>Cultural Environment Investigations<\/em><\/strong> &#8211; archaeological assessments and photographic documentation of the property, including photos of the exteriors of buildings and other landscape features.<\/li>\n<li><strong><em>Engineering Investigations<\/em><\/strong> &#8211; geotechnical and borehole investigations; utility locate surveys; topographic surveys.<\/li>\n<\/ul>\n<p>Phase 4 fieldwork will begin in April 2025 and is anticipated to be completed by December 31, 2026.<\/p>\n\t<h2>Property Acquisition<\/h2>\n<p>If you receive a PTE form and are subject to a PTE requirement, this does\u00a0not\u00a0mean we will need to acquire your property. PTE will be used only to establish environmental conditions and assess the engineering feasibility of the new transportation corridor. Property acquisition requirements will be confirmed at the conclusion of the Preliminary Design.<\/p>\n\t<h2>Special Considerations<\/h2>\n<p>Please advise us if there are any special requirements or precautionary measures that staff should take while visiting your property. For example, if we need to accommodate sensitive farm operations, harvesting or seasonal breeding.<\/p>\n\t<h2>PTE Contact Information<\/h2>\n<p>If you would like to speak with someone directly regarding a specific question, concern or clarification related to the PTE process or form, please contact:<\/p>\n<strong>Nadia Dabagh, PTE Coordinator<\/strong><br \/>\nPhone:\u00a0<a role=\"link\" href=\"tel:\/\/289-835-2519\">289-835-2519<\/a><br \/>\nE-mail: <a tabindex=\"-1\" title=\"mailto:pte@highway413.ca\" href=\"mailto:PTE@Highway413.ca\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link PTE@Highway413.ca\">PTE@Highway413.ca<\/a>\n<p>Nadia will provide you with a response within 3-5 business days.<\/p>\n\t<h2>PTE Resources<\/h2>\n\t\t<ul>\n\t\t\t\t\t<li>\n\t\t\t\t\t<a href=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2022\/02\/PTE-Factsheet_Phase1_January2020_Final.pdf\" target=\"_blank\">\n\t\t\t\t<h3>PTE Phase 1 &#8211; Factsheet (February 2020)<\/h3>\n\t\t\t\t\t<\/a>\n\t\t\t<\/li>\n\t\t\t\t\t<li>\n\t\t\t\t\t<a href=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2022\/02\/Hwy-413_Phase-2-PTE-Fieldwork-Factsheet_February-2022.pdf\" target=\"_blank\">\n\t\t\t\t<h3>PTE Phase 2 &#8211; Factsheet (February 2022)<\/h3>\n\t\t\t\t\t<\/a>\n\t\t\t<\/li>\n\t\t\t\t\t<li>\n\t\t\t\t\t<a href=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2023\/02\/Phase-3-Fieldwork-Factsheet-December-2022.pdf\" target=\"_blank\">\n\t\t\t\t<h3>PTE Phase 3 &#8211; Factsheet (December 2022)<\/h3>\n\t\t\t\t\t<\/a>\n\t\t\t<\/li>\n\t\t\t\t\t<li>\n\t\t\t\t\t<a href=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2025\/03\/PTE-Phase-4-Fieldwork-Factsheet-April-2025.pdf\" target=\"_blank\">\n\t\t\t\t<h3>PTE Phase 4 &#8211; Factsheet (April 2025)<\/h3>\n\t\t\t\t\t<\/a>\n\t\t\t<\/li>\n\t\t\t\t<\/ul>\n\t<h2>Frequently\u2028Asked\u2028Questions<\/h2>\n<p>&nbsp;<\/p>\n\t\t\t\tWhy are these field investigations required?\n\t\t\t\t\t<p>Field investigations allow researchers to assess the natural, socio-economic and cultural environments and conduct investigations to determine the most responsible way to move forward, while avoiding or minimizing negative effects. There are a wide variety of field investigations that can occur in support of this project (as outlined in the above Fieldwork Phase descriptions).<\/p>\n<p>It is important to obtain information from field investigations to document existing conditions and avoid or minimize negative effects and develop appropriate mitigation measures for any areas containing significant\/sensitive features.<\/p>\n\t\t\t\tWhat is the Preferred Alignment?\n\t\t\t\t\t<p>The Preferred Alignment illustrates the layout and interchange locations for the Highway 413 corridor. The Project Team is currently developing the Preliminary Design and investigating opportunities for refinement as the results of fieldwork investigations are received.<\/p>\n<nav aria-label=\"Menu\">\n\t<ul id=\"menu-1-\"><li id=\"menu-item-4271\"><a href=\"#PTE\">PTE<\/a><\/li>\n<li id=\"menu-item-4272\"><a href=\"#BPDT\">PTE Background, Progress to Date &#038; Timelines<\/a><\/li>\n<li id=\"menu-item-4273\"><a href=\"#FAQ\">FAQ<\/a><\/li>\n<\/ul><\/nav>\n\n","protected":false},"excerpt":{"rendered":"<p>Fran\u00e7ais Highway 413 Preliminary Design and Assessment of Environmental Impacts: Permission To Enter (PTE) Permission To Enter (PTE) Field investigations are being conducted to inventory existing environmental and engineering conditions within the Highway 413 Project Study Area. Permission to Enter (PTE) grants the Project Team temporary access to private property with the consent of the &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"Permission To Enter (PTE)\" class=\"read-more button\" href=\"https:\/\/highway413.ca\/en\/pte\/#more-2175\" aria-label=\"Read more about Permission To Enter (PTE)\">Read more<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":0,"menu_order":17,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"folder":[],"class_list":["post-2175","page","type-page","status-publish"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Permission To Enter (PTE) - Highway 413<\/title>\n<meta name=\"description\" content=\"Field investigations are underway to assess the current environmental and engineering conditions within the Highway 413 Project Study Area.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/highway413.ca\/en\/pte\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Permission To Enter (PTE) - Highway 413\" \/>\n<meta property=\"og:description\" content=\"Field investigations are underway to assess the current environmental and engineering conditions within the Highway 413 Project Study Area.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/highway413.ca\/en\/pte\/\" \/>\n<meta property=\"og:site_name\" content=\"Highway 413\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-25T18:11:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-365-2.png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/pte\\\/\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/pte\\\/\",\"name\":\"Permission To Enter (PTE) - Highway 413\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/pte\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/pte\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Group-365-2.png\",\"datePublished\":\"2022-09-07T18:02:50+00:00\",\"dateModified\":\"2025-08-25T18:11:42+00:00\",\"description\":\"Field investigations are underway to assess the current environmental and engineering conditions within the Highway 413 Project Study Area.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/pte\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/highway413.ca\\\/en\\\/pte\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/pte\\\/#primaryimage\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Group-365-2.png\",\"contentUrl\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Group-365-2.png\",\"width\":222,\"height\":222,\"caption\":\"A green mailbox icon centered inside a green circle on a white background; no text or additional elements.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/pte\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/highway413.ca\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Permission To Enter (PTE)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/\",\"name\":\"Highway 413\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/highway413.ca\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#organization\",\"name\":\"Highway 413\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/hwy413-Logo-English.jpg\",\"contentUrl\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/hwy413-Logo-English.jpg\",\"width\":1390,\"height\":247,\"caption\":\"Highway 413\"},\"image\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Permission To Enter (PTE) - Highway 413","description":"Field investigations are underway to assess the current environmental and engineering conditions within the Highway 413 Project Study Area.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/highway413.ca\/en\/pte\/","og_locale":"en_US","og_type":"article","og_title":"Permission To Enter (PTE) - Highway 413","og_description":"Field investigations are underway to assess the current environmental and engineering conditions within the Highway 413 Project Study Area.","og_url":"https:\/\/highway413.ca\/en\/pte\/","og_site_name":"Highway 413","article_modified_time":"2025-08-25T18:11:42+00:00","og_image":[{"url":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-365-2.png","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/highway413.ca\/en\/pte\/","url":"https:\/\/highway413.ca\/en\/pte\/","name":"Permission To Enter (PTE) - Highway 413","isPartOf":{"@id":"https:\/\/highway413.ca\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/highway413.ca\/en\/pte\/#primaryimage"},"image":{"@id":"https:\/\/highway413.ca\/en\/pte\/#primaryimage"},"thumbnailUrl":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-365-2.png","datePublished":"2022-09-07T18:02:50+00:00","dateModified":"2025-08-25T18:11:42+00:00","description":"Field investigations are underway to assess the current environmental and engineering conditions within the Highway 413 Project Study Area.","breadcrumb":{"@id":"https:\/\/highway413.ca\/en\/pte\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/highway413.ca\/en\/pte\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/highway413.ca\/en\/pte\/#primaryimage","url":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-365-2.png","contentUrl":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2024\/12\/Group-365-2.png","width":222,"height":222,"caption":"A green mailbox icon centered inside a green circle on a white background; no text or additional elements."},{"@type":"BreadcrumbList","@id":"https:\/\/highway413.ca\/en\/pte\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/highway413.ca\/en\/"},{"@type":"ListItem","position":2,"name":"Permission To Enter (PTE)"}]},{"@type":"WebSite","@id":"https:\/\/highway413.ca\/en\/#website","url":"https:\/\/highway413.ca\/en\/","name":"Highway 413","description":"","publisher":{"@id":"https:\/\/highway413.ca\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/highway413.ca\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/highway413.ca\/en\/#organization","name":"Highway 413","url":"https:\/\/highway413.ca\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/highway413.ca\/en\/#\/schema\/logo\/image\/","url":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2021\/11\/hwy413-Logo-English.jpg","contentUrl":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2021\/11\/hwy413-Logo-English.jpg","width":1390,"height":247,"caption":"Highway 413"},"image":{"@id":"https:\/\/highway413.ca\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/pages\/2175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/comments?post=2175"}],"version-history":[{"count":50,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/pages\/2175\/revisions"}],"predecessor-version":[{"id":4742,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/pages\/2175\/revisions\/4742"}],"wp:attachment":[{"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/media?parent=2175"}],"wp:term":[{"taxonomy":"folder","embeddable":true,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/folder?post=2175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}