{"id":4846,"date":"2025-08-26T16:30:00","date_gmt":"2025-08-26T20:30:00","guid":{"rendered":"https:\/\/highway413.ca\/en\/?page_id=4846"},"modified":"2026-03-12T13:59:46","modified_gmt":"2026-03-12T17:59:46","slug":"home-2","status":"publish","type":"page","link":"https:\/\/highway413.ca\/en\/","title":{"rendered":"Highway 413"},"content":{"rendered":"\n\n\t<a href=\"https:\/\/highway413.ca\/fr\/\" target=\"_self\" role=\"button\" aria-label=\"Fran\u00e7ais\">\n\t\t\t\t\t\tFran\u00e7ais\n\t\t\t\t\t<\/a>\n<h2>\n\t\t\tExplore the preliminary transportation corridor design through the Highway 413 interactive map.*\u00a0\t<\/h2>\n\t<p>* The accuracy of these maps extends to\u00a0March 12, 2026\u00a0and is based on the Preliminary Design reflected in the\u00a0final\u00a0Environmental Impact Assessment Report, which was prepared accordance with the process set out in the <em>Highway 413 Act<\/em> and the <em>Highway Designation under the Public Transportation Highway Improvement Act.<\/em><i>&#8220;<\/i><\/p>\n\t\t\t<a href=\"https:\/\/experience.arcgis.com\/experience\/793c5e5cc2c644369555397b9aeebc45\/page\/Interactive-Map\"  target=\"_blank\" rel=\"noopener\"    rel=\"noopener\">\n\t\t\t\t\t\t\tExplore the Highway 413 interactive map\n\t\t\t\t\t<\/a>\n\t\t<h2>\n\t\t\tLatest Updates\n\t\t<\/h2>\n\t\t<h2>\n\t\t\tHighway 413 is a highway and transit corridor running through York, Peel and Halton Regions.\n\t\t<\/h2>\n<figure itemscope itemtype=\"https:\/\/schema.org\/ImageObject\">\n\t\t\t\t<a href=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2026\/03\/Highway-413-Blue-Map-EN-12-05-2025.jpg\"  target=\"_self\" itemprop=\"url\">\n\t\t\t\t<img decoding=\"async\" src=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2026\/03\/Highway-413-Blue-Map-EN-12-05-2025.jpg\" alt=\"A map showing the preliminary design route of Ontario Highway\u202f413 from Highway\u202f401\/407 in the west near Halton Hills, curving north around Brampton, and then east across Caledon and Vaughan to Highway\u202f400. The route is marked with a thick blue line, with blue dots indicating planned interchanges.\" height=\"1927\" width=\"1920\" title=\"Highway-413-Blue-Map-EN-12-05-2025\" onerror=\"this.style.display='none'\" loading=\"lazy\" \/>\n\t\t\t\t<\/a>\n\t<\/figure>\n\t<p>The Project includes the 52-kilometre (km) Highway 413 corridor, a 4 km extension to Highway 410, and a 3 km extension to Highway 427 (both facilitating connection to the Highway 413 corridor), for a total of 59 km of new infrastructure.<\/p>\n<p>The highway will have 11 interchanges at municipal roads. Features such as service centres, carpool lots, truck inspection stations, and the potential for electric vehicle charging stations, have been explored as part of Preliminary Design.<\/p>\n<p>The transitway will be a separate corridor running alongside the highway, dedicated for public transit, which will be subject to a separate Environmental Assessment (EA).<\/p>\n\t\t\n\t\t\t<p>Highway 413 will extend from Highway 400, between King Road and Kirby Road, to the 401\/407 ETR interchange in Mississauga, Milton and Halton Hills.<\/p>\t\t\n\n","protected":false},"excerpt":{"rendered":"<p>Fran\u00e7ais Explore the preliminary transportation corridor design through the Highway 413 interactive map.*\u00a0 * The accuracy of these maps extends to\u00a0March 12, 2026\u00a0and is based on the Preliminary Design reflected in the\u00a0final\u00a0Environmental Impact Assessment Report, which was prepared accordance with the process set out in the Highway 413 Act and the Highway Designation under the &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"Highway 413\" class=\"read-more button\" href=\"https:\/\/highway413.ca\/en\/#more-4846\" aria-label=\"Read more about Highway 413\">Read more<\/a><\/p>\n","protected":false},"author":14,"featured_media":1284,"parent":0,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"folder":[],"class_list":["post-4846","page","type-page","status-publish","has-post-thumbnail"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Highway 413<\/title>\n<meta name=\"description\" content=\"Highway 413 is a 52-kilometre proposed highway &amp; transit corridor running through York, Peel &amp; Halton Regions. It could save you up to 30 mins.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/highway413.ca\/en\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Highway 413\" \/>\n<meta property=\"og:description\" content=\"Highway 413 is a 52-kilometre proposed highway &amp; transit corridor running through York, Peel &amp; Halton Regions. It could save you up to 30 mins.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/highway413.ca\/en\/\" \/>\n<meta property=\"og:site_name\" content=\"Highway 413\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-12T17:59:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2020\/08\/3d48d522ac72040c0beaa1c40c60403e.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"713\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/\",\"name\":\"Highway 413\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/3d48d522ac72040c0beaa1c40c60403e.jpg\",\"datePublished\":\"2025-08-26T20:30:00+00:00\",\"dateModified\":\"2026-03-12T17:59:46+00:00\",\"description\":\"Highway 413 is a 52-kilometre proposed highway & transit corridor running through York, Peel & Halton Regions. It could save you up to 30 mins.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/highway413.ca\\\/en\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#primaryimage\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/3d48d522ac72040c0beaa1c40c60403e.jpg\",\"contentUrl\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/3d48d522ac72040c0beaa1c40c60403e.jpg\",\"width\":700,\"height\":713,\"caption\":\"Ontario Making Travel Easier Across York, Peel and Halton Regions - Map showing GTA West Route Planning Study Area\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/highway413.ca\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Highway 413\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/\",\"name\":\"Highway 413\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/highway413.ca\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#organization\",\"name\":\"Highway 413\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/hwy413-Logo-English.jpg\",\"contentUrl\":\"https:\\\/\\\/highway413.ca\\\/en\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/hwy413-Logo-English.jpg\",\"width\":1390,\"height\":247,\"caption\":\"Highway 413\"},\"image\":{\"@id\":\"https:\\\/\\\/highway413.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Highway 413","description":"Highway 413 is a 52-kilometre proposed highway & transit corridor running through York, Peel & Halton Regions. It could save you up to 30 mins.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/highway413.ca\/en\/","og_locale":"en_US","og_type":"article","og_title":"Highway 413","og_description":"Highway 413 is a 52-kilometre proposed highway & transit corridor running through York, Peel & Halton Regions. It could save you up to 30 mins.","og_url":"https:\/\/highway413.ca\/en\/","og_site_name":"Highway 413","article_modified_time":"2026-03-12T17:59:46+00:00","og_image":[{"width":700,"height":713,"url":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2020\/08\/3d48d522ac72040c0beaa1c40c60403e.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/highway413.ca\/en\/","url":"https:\/\/highway413.ca\/en\/","name":"Highway 413","isPartOf":{"@id":"https:\/\/highway413.ca\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/highway413.ca\/en\/#primaryimage"},"image":{"@id":"https:\/\/highway413.ca\/en\/#primaryimage"},"thumbnailUrl":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2020\/08\/3d48d522ac72040c0beaa1c40c60403e.jpg","datePublished":"2025-08-26T20:30:00+00:00","dateModified":"2026-03-12T17:59:46+00:00","description":"Highway 413 is a 52-kilometre proposed highway & transit corridor running through York, Peel & Halton Regions. It could save you up to 30 mins.","breadcrumb":{"@id":"https:\/\/highway413.ca\/en\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/highway413.ca\/en\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/highway413.ca\/en\/#primaryimage","url":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2020\/08\/3d48d522ac72040c0beaa1c40c60403e.jpg","contentUrl":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2020\/08\/3d48d522ac72040c0beaa1c40c60403e.jpg","width":700,"height":713,"caption":"Ontario Making Travel Easier Across York, Peel and Halton Regions - Map showing GTA West Route Planning Study Area"},{"@type":"BreadcrumbList","@id":"https:\/\/highway413.ca\/en\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/highway413.ca\/en\/"},{"@type":"ListItem","position":2,"name":"Highway 413"}]},{"@type":"WebSite","@id":"https:\/\/highway413.ca\/en\/#website","url":"https:\/\/highway413.ca\/en\/","name":"Highway 413","description":"","publisher":{"@id":"https:\/\/highway413.ca\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/highway413.ca\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/highway413.ca\/en\/#organization","name":"Highway 413","url":"https:\/\/highway413.ca\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/highway413.ca\/en\/#\/schema\/logo\/image\/","url":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2021\/11\/hwy413-Logo-English.jpg","contentUrl":"https:\/\/highway413.ca\/en\/wp-content\/uploads\/2021\/11\/hwy413-Logo-English.jpg","width":1390,"height":247,"caption":"Highway 413"},"image":{"@id":"https:\/\/highway413.ca\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/pages\/4846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/comments?post=4846"}],"version-history":[{"count":13,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/pages\/4846\/revisions"}],"predecessor-version":[{"id":5177,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/pages\/4846\/revisions\/5177"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/media\/1284"}],"wp:attachment":[{"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/media?parent=4846"}],"wp:term":[{"taxonomy":"folder","embeddable":true,"href":"https:\/\/highway413.ca\/en\/wp-json\/wp\/v2\/folder?post=4846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}