Environmental Considerations

Learn about the process for assessing impacts to the environment under the Highway 413 Act (2024) and how Ontario protects the environment when building new infrastructure.

The Assessment of Environmental Impacts

The assessment of environmental impacts is being undertaken in accordance with the process set out in the Highway 413 Act. The Act provides the structural framework for the preparation of an Environmental Impact Assessment Report (EIAR) to:

  • document the evolution of the various alternatives considered for the Highway 413 Project;
  • present the Preferred Alignment (Recommended Plan);
  • outline the environmental impacts and proposed mitigation measures; and
  • summarize all environmental commitments.

Greenbelt and Agricultural Considerations

Ontario’s Greenbelt Plan recognizes the importance of infrastructure for people’s economic well-being, health and quality of life and it permits new projects provided they service the significant growth and economic development expected in southern Ontario. The province is committed to maintaining strong environmental oversight of Highway 413 to minimize impacts on natural terrain. Ontario is also taking steps to expand the Greenbelt to protect environmental, groundwater and agricultural resources for future generations.

The preferred alignment for Highway 413 was chosen in part to minimize impacts to the Greenbelt. As the project progresses, The Ontario Ministry of Transportation (MTO) will carefully consider all impacts of Highway 413 and its construction. For example, protecting major watercourses, including the Credit and Humber rivers, was a top priority when determining the Preferred Alignment. Proposed watercourse crossings would be designed with the intent to minimize the impacts to the watercourses, the valley lands, floodplains, fish habitat, wildlife and trail networks. This would help to minimize the project’s impact, maintain fish passage and habitat, minimize vegetation loss and protect Species at Risk.

Protecting agricultural lands is also a top consideration. While a new transportation corridor cannot completely avoid impacting agricultural land, the Project Team will undertake an Agricultural Impact Assessment to help understand and minimize the impacts on the region’s agricultural land.

In the process for assessing impacts to the environment, the Project Team has undertaken significant data collection, fieldwork and analysis, evaluated alternatives, held numerous community and advisory group meetings, engaged and consulted with Indigenous communities and determined a Preferred Alignment. The following discipline studies are being carried out in support of the EIAR:

  • Fish and Fish Habitat
  • Terrestrial Ecosystems
  • Watercourse Crossing Analysis
  • Drainage and Stormwater Management
  • Fluvial Geomorphology
  • Groundwater
  • Landscape Composition
  • Stage 2 Archaeological Assessment
  • Built Heritage and Cultural Heritage Landscapes
  • Land Use Inventory
  • Agricultural Impact Assessment
  • Contaminated Property Identification and Waste Management
  • Air Quality
  • Noise
  • Snowdrift Assessment

Completion of the Transportation Development Strategy (2012) included studying the area and looking at long-term modelling projections to determine if new road infrastructure was truly needed.

Building infrastructure responsibly

Two construction workers in safety vests and helmets stand at a site with scaffolding and a crane. One points toward the work area as the sun rises or sets behind them.

During the completion of the Transportation Development Strategy (2012), guidelines were developed to identify ways to minimize the impacts on the Greenbelt. The guidelines recommend the use of “green” infrastructure and planning, design and construction practices, such as:

  • Community-sensitive design
  • Consideration of impacts to ecology and wildlife
  • Consideration of impacts to agriculture
  • Stormwater management
  • Designing features such as bridges to minimize environmental impacts

Environmentally-Friendly Practices and Technologies

Ontario is using and exploring environmentally-friendly practices and technologies while building major infrastructure projects, such as:

GreenPave

A system that rates asphalt and concrete pavement to assess its “greenness.” GreenPave promotes environmentally-responsible design and construction by encouraging the use of alternate fuels, local and recycled materials and reduces energy consumption, air pollutants, harmful emissions and more.

Tree Planting

Ontario supports programs that add new trees along highways and other infrastructure. For example, the Highway of Heroes program has planted nearly one million trees as a living tribute to Canada’s veterans, including more than 52,000 directly alongside Highway 401.

SmogStop Barriers

Ontario is exploring the use of noise barriers that are also designed to reduce air pollution. Emissions from vehicles are directed into channels where they react with a special photoreactive coating to reduce nitrogen oxides and volatile organic compounds into harmless by-products. The reaction is powered by sunlight and no electrical connections are required.

These methods and others like them can reduce the environmental impacts of Ontario’s major infrastructure projects like Highway 413.

Navigable Waterways

Plans for work in or around any navigable waterway may require authorization from Transport Canada.

A navigable waterway, as defined in the Canadian Navigable Waters Act (CNWA), is “a body of water, including a canal or any other body of water created or altered as a result of the construction of any work, that is used or where there is a reasonable likelihood that it will be used by vessels, in full or in part, for any part of the year as a means of transport or travel for commercial or recreational purposes, or as a means of transport or travel for Indigenous peoples of Canada exercising rights recognized and affirmed by section 35 of the Constitution Act, 1982, and

  • there is public access by land or by water;
  • there is no such public access, but there are two or more riparian* owners or
  • His Majesty in right of Canada or a province is the only riparian owner.”

* Riparian refers to relating to or situated on the banks of a body of water.

Initial Screening

Within the Study Area, the Project Team has identified 24 stream or river locations that may be navigable.

As part of the assessment to initially determine the navigability of the watercourses crossing the proposed Highway 413, Hwy 410 and Hwy 427 extensions, fluvial geomorphic data (channel definition, hydraulic flow regime, and channel dimensions) were used to set the criteria for this initial assessment. This initial screening assessment is based on a previous navigable waters requirement that a channel must be at least 3.00 m wide and about 0.30 m deep across the channel.

The below mapping provides the results of this initial screening assessment. However, further consultation and field investigations will be needed to complete the assessment for the navigability of the initially screened water crossings. Please use the numbering on the map to identify the corresponding watercourse potentially used for navigation.

Privacy Overview
Logo for Highway 413. Three green curved lines on the left resemble a road. To the right, bold black text reads “HIGHWAY 413” with smaller green text below: “Planning with Vision | Planning for People.”

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.