Highway 413 Preliminary Design and Assessment of Environmental Impacts: Permission To Enter (PTE)

Permission To Enter (PTE)

Field investigations are being conducted to inventory existing environmental and engineering conditions within the Highway 413 Project Study Area. Permission to Enter (PTE) grants the Project Team temporary access to private property with the consent of the property owner(s) to conduct these investigations. This important step in the assessment of impacts allows the Project Team to confirm existing conditions, determine anticipated impacts, and develop appropriate mitigation measures along the Highway 413 Preferred Alignment.

Property owners within the Preferred Alignment were sent a PTE notification package, including a PTE letter, agreement, questionnaire, and fact sheet. Property owners in receipt of a PTE notification package are encouraged to follow the instructions below.

  • Group 365 (2)

    01

    Step 1: Receiving your PTE Form

    Property owners will be notified by letter and/or email and will receive a PTE form.

  • Group 366 (1)

    02

    Step 2: Review and Sign your PTE Form

    Property owners are requested to review and sign the PTE form. Please complete the Owner(s) name, mailing address, and the required email and phone number sections.

    Where applicable, complete the associated questionnaire that is included in the PTE notification package.

    If you would like to receive an electronic copy of the PTE form and questionnaire for e-signature, please email PTE@highway413.ca, with your first and last name, property address, PIN number and Key ID number (all found on the PTE form).

  • Group 367

    03

    Step 3: Submit your PTE form and questionnaire to the Project Team

    Return a signed copy to the Project Team by email to PTE@highway413.ca within three (3) weeks of receipt.

    ATTN: Nadia Dabagh
    25 York Street, Suite 700
    Toronto, Ontario M5J 2V5

  • Group 368

    04

    Step 4: Property Access

    Property owners will be notified by a member of the Project Team three to five business days prior to field staff entering your property.

    Property owner cooperation through the signing and returning of the PTE form is greatly appreciated.

Background, Progress to Date & Timelines

Fieldwork is vital in Preliminary Design. It is a data-collecting exercise that informs decisions on aspects like bridge designs, pavement types, interchange locations, and configurations. This data also allows the Project Team to identify existing environmental conditions and determine potential negative and positive impacts so that the negative impacts can be mitigated or avoided altogether.

The Phase 1 field investigation program was completed in December 2020. The Phase 2 field investigation program began in September 2021 and was completed in December 2022. The Phase 3 field investigation program began in December 2022 and was completed in December 2024.

Phase 4 field investigations will begin in April 2025 and may continue until December 2026.

Property Acquisition

If you receive a PTE form and are subject to a PTE requirement, this does not mean we will need to acquire your property. PTE will be used only to establish environmental conditions and assess the engineering feasibility of the new transportation corridor. Property acquisition requirements will be confirmed at the conclusion of the Preliminary Design.

Special Considerations

Please advise us if there are any special requirements or precautionary measures that staff should take while visiting your property. For example, if we need to accommodate sensitive farm operations, harvesting or seasonal breeding.

PTE Contact Information

If you would like to speak with someone directly regarding a specific question, concern or clarification related to the PTE process or form, please contact:

Nadia Dabagh, PTE Coordinator
Phone: 289-835-2519
E-mail: PTE@Highway413.ca

Nadia will provide you with a response within 3-5 business days.

Frequently
Asked
Questions

 

Why are these field investigations required?

Field investigations allow researchers to assess the natural, socio-economic and cultural environments and conduct investigations to determine the most responsible way to move forward, while avoiding or minimizing negative effects. There are a wide variety of field investigations that can occur in support of this project (as outlined in the above Fieldwork Phase descriptions).

It is important to obtain information from field investigations to document existing conditions and avoid or minimize negative effects and develop appropriate mitigation measures for any areas containing significant/sensitive features.

Privacy Overview
Logo for Highway 413. Three green curved lines on the left resemble a road. To the right, bold black text reads “HIGHWAY 413” with smaller green text below: “Planning with Vision | Planning for People.”

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.