Draft Environmental Impact Assessment Report
On December 1, 2025 the Highway 413 draft Environmental Impact Assessment Report was released for comment. The comment period closed on January 6, 2026. We thank you for your interest and feedback on the Highway 413 Project. Comments provided during the comment period by the public, federal and provincial agencies, municipal representatives, Indigenous communities, and other interested persons will be reviewed and described in the final EIAR, anticipated to be released in early 2026.
This material will be maintained on file for use during the Project and may be included in project documentation. Information collected will be used in accordance with the Freedom of Information and Protection of Privacy Act. We thank you for your interest and feedback on the Highway 413 Project.
The Project
The Highway 413 Project will connect Highway 400 in the Regional Municipality of York to Highway 401 and Highway 407 Express Toll Route (407 ETR) in the Regional Municipality of Halton and the Regional Municipality of Peel. The completed corridor will create a total of 59 kilometres (km) of new highway infrastructure. This includes:
- A 52 km Highway 413 corridor
- A 4 km extension to Highway 410
- A 3 km extension to Highway 427
It will also include 11 interchanges at municipal roads, stormwater management ponds, carpool lots, commercial vehicle inspection facilities, and maintenance facilities. The map below shows the location of the Highway 413, including the Highway 410 and Highway 427 extensions which will connect to Highway 413.
Assessment of Environmental Impacts Process
In accordance with Section 6 of the Highway 413 Act, 2024, a draft EIAR has been prepared to describe the Preliminary Design of the Highway 413 Project. The report outlines the various alternatives considered, the environmental studies completed for the Project and describes potential environmental impacts as well as proposed mitigation measures. It also includes a record of consultation that summarizes the consultation and engagement carried out with Indigenous communities, regulatory agencies, stakeholders, and the public in respect of the Project
This assessment of environmental impacts builds upon the considerable work that the Ontario Ministry of Transportation (MTO) has undertaken since 2007 to advance the Highway 413 Preliminary Design and Assessment of Environmental Impacts, referred to as “the Project”. This includes environmental and engineering investigations involving over 20 disciplines and consultation and engagement with municipalities, interested stakeholders, and members of the public, as well as engagement with Indigenous communities.
Webinar
A webinar was held on December 3, 2025 to share information on the draft EIAR and provide insight on how to navigate the document. A recording of the webinar is now available.
Highway 413 Information Centre
Visit the Highway 413 Information Centre for further information on the draft EIAR, including a summary of environmental studies and an Interactive Map to further explore Highway 413's Preliminary Design.
How to Navigate the Document
The Highway 413 Act, 2024 received Royal Assent on November 25th, 2024. In accordance with the requirements of the Highway 413 Act, 2024 the draft Environmental Impact Assessment Report includes, environmental studies completed for the project alongside potential environmental impacts and proposed mitigation measures, and the record of consultation.
-
Description of Highway 413
- A statement on the purpose of the Project and a description of the Project, based on the Preliminary Design.
-
Development of the Preliminary Design
- Maps showing the location and preliminary designs of the Highway 413 Project, including the extensions of Highway 410 and Highway 427.
- Descriptions of the various alternatives considered for the Highway 413 Project as well as the rationale for selecting the current alignment.
-
Environmental Considerations
- A summary of the local environmental conditions.
- A description of the environmental studies completed for the Project, potential environmental impacts, and proposed mitigation measures.
- A description of how mitigation will be carried forward, assessed, and monitored during future design phases.
- A list of provincial, federal or other authorizations which may be required for the Project.
-
Consultation and Engagement
- A record of consultation and engagement with regulatory agencies, the public, stakeholders and Indigenous communities.
See below for more information on the content included in each chapter of the draft EIAR.